PROJECTS

 

Alpha Controls has worked on a wide variety of projects in the oil and gas, commercial, and civil fields. These include: subdivisions, parking lots, oilfield facilities, major BC Hydro expansions, and apartment blocks.

Sunset Ridge Subdivision Phases 1-8

Alpha Controls has been involved in all phases of this residential subdivision by installing the Hydro, Telus, and Shaw shallow utilities. Alpha has also installed all of the City Streetlights and received all of the necessary sign offs from the Utilities so that hook ups to the grid could be achieved.

Surerus Industrial Park Phases 1-2

Alpha Controls completed the shallow utility and street light installation in this industrial subdivision.

Energy Park
Phases 1-3

As with the Sunset Ridge Subdivision, Alpha Controls has been involved in all phases of this residential subdivision by installing the Hydro, Telus, and Shaw shallow utilities. Alpha has also installed all of the City Streetlights and received all of the necessary sign offs from the Utilities so that hook ups to the grid could be achieved.

86th St BC Hydro Mainline Expansion

Alpha Controls is an accredited contractor for BC Hydro and is able to do projects like this very specialized hydro mainline type expansion work. This particular project saw BC Hydro remove all of their overhead hydro lines and remove the poles after all of the mainline was installed underground by Alpha Controls. The mainline was all completely concrete encased and this project saw the installation of some of the largest hydro boxes that have been installed in all of British Columbia. This project was completed on time and on budget.

OTHER PROJECTS WE HAVE COMPLETED:
 

1- 2015 City of Fort St. John Capital Roadworks LED street lighting.

 

2- 2015 City of Fort St. John LAS LED street lighting.

 

3- 2014 City of Fort St. John Capital Roadworks LED street lighting.

 

4- 2014 City of Fort St. John LAS LED street lighting.

 

5- City of Fort St. John new Firehall road signals.

 

6- Complete electrical installation at the Revolution Honda Dealership building in Fort St. John, including
parking lot and lights.

 

7- Complete electrical install of 4 story Phoenix Apartments in Fort St John.

 

8- Complete electrical install of the Stillwater Inn and Suites in Hudson’s Hope.

 

9- Complete catadyne upgrade and new installation in the Ring Border area for Conocophillips Canada.

 

10- Parking lot lighting install at the Pomeroy Sports Centre Phases 1 & 2.

 

11- Parking lot lighting install for Pomeroy Hotel and Casino.

 

12- Parklane Estates Subdivision shallow utilities.

 

13- Evergreen Estates Subdivision shallow utilities Phases 1-3.

 

14- Complete electrical and instrumentation on new well construction for Devon Canada in Peggo and Martin creek areas.

 

15- Complete electrical install of the Western Valley Inn in Valleyview, Alberta.

 

16- Electrical installation at the new shop for Desa Pipeline.

17- Complete electrical and instrumentation construction on compressor, dehydrator, separator and inlets for Anadarko Canada in the Buckinghorse area.


 

Phoenix Apartments FSJ

Alpha Controls completed the electrical work on the Phoenix apartment block in Fort St John. This apartment block is a 40 unit facility that has a 208 volt main system and Alpha did the underground work, the transformer pad installation, the parking lots plugs and lights as well as the complete wiring in all of the suites. This is work that Alpha Controls will continue to be involved with, as we are very well suited for this size of a project.

Oilfield Meter Skids

Alpha Controls is well suited to do any size meter skid installation and tie the skid in from the wellhead right through to the SCADA work to see the signal at the main facility.

Alpha Controls has been involved with a few winter programs that saw us tie in and commission as many as 20 well sites in one winter season. Alpha Controls can also supply material and labour to do the construction on compressor, dehydrator and inlet facilities as required and have been involved in several installations of this type.

North Peace Regional Airport Parking Lot Electrical & Lighting
Phase 1 & 2

Alpha Controls is able to do any sized parking lot electrical and lighting project. This project consisted of two phases, with new parking lot lights and winter receptacles in each phase.

The first phase was a new parking lot with a dedicated feed from BC Hydro to power the lights and receptacles. Phase 2 was the renovation of the original parking lot, as well as the addition of a new parking lot on either side of Phase 1. Both phases of construction are fed with 600 volt mains, with waterproof electrical kiosks to control lighting, and to reduce voltage for the winter receptacles. Electrical work also included automated security gates and cameras.

Both phases were completed on time and on budget.

 

© 2015 Alpha Controls Ltd

 

7819 93rd St

Fort St. John, B.C

PO Box 330 Downtown PO

V1J 6W7

250-787-7481

mail.acl@pris.ca